Problems resulting from establishment of the Akasombo dam project
The Akasombo dam project was opened in 1966 and was built across the volta river where the river passes through the narrow gorge. The project was funded by Ghana, the United States of America, Britain, and the world bank.
The following are problems which resulted from the establishment of the Akasombo dam project:
The loss of biodiversity, vegetation, and animal life was lost due to dam construction.
The decrease in the delta size due to reduced silt deposits and this negatively affected coastal activities such as tourism
Stagnation of water led to waterborne diseases such as bilharzia
Reduction of farming activities in the delta region due to the loss of fertile alluvial soil
The siltation of the lake, which necessitated constant dredging, is expensive
Displacement of many people from their land, since many villages were drowned by lake water
The high cost of resettling displaced people and the disruption of families
Pollution of the environment due to the development of many industries such as aluminium smelting at Tema.
RELATED POSTS
COMPARISON BETWEEN FISHING IN KENYA AND JAPAN
THE CONCEPT OF ENVIRONMENT, COMPONENTS OF ENVIRONMENT AND THE PROBLEM FACING ENVIRONMENT
Five (5) Advantages of questionnaire as data collection tool in research
5 DISADVANTAGES OF ROAD TRANSPORT
10 FACTORS THAT AFFECT OCEAN SALINITY
CAUSES AND EFFECTS OF OCEAN BREEZE AND SEA BREEZE
PLATE TECTONICS THEORY EXPLAINED
9 CHARACTERISTICS OF COMMERCIAL LIVESTOCK FARMING
Characteristics of tropical northern climate
12 FACTORS THAT FAVOURED THE ESTABLISHMENT OF THE ASWAN HIGH DAM PROJECT IN EGYPT
Comments
Post a Comment