11 FACTORS THAT HAVE FAVOURED THE ESTABLISHMENT OF AKASOMBO DAM PROJECT IN GHANA
The Akasombo dam project was opened in 1966 and was built across the volta river where the river passes through the narrow gorge.
The project was funded by Ghana, the United States of America, Britain, and the world bank.
The following are factors which have favored the establishment of the Akasombo dam project:
Presence of skilled labor used in the construction and maintenance of dam project
The high level of technology employed to put up the project, provided especially by Britain and the USA such as the use of large turbines to generate power
The presence of a large market for power in the surrounding countries, which encouraged investment in the dam projects.
The seasonal fluctuation of the Volta and therefore the need to regulate the flow such as control of flooding during the rainy season.
There was a need to generate hydroelectric power to replace thermal, which was consuming a lot of foreign exchange through oil imports
presence of narrow gorge (deep narrow valley) for easy construction of the dam
presence of waterfalls hence the fast flow of water to turn turbines
presence of hard basement rock which provided a firm foundation for the construction of the dam
The presence of extensive land behind the hills was due to the sparse population, which could accommodate a large reservoir behind the dam.
RELATED POSTS
9 CONDITIONS FAVOURING IRRIGATION FARMING IN EGYPT
5 CAUSES OF RURAL-RURAL MIGRATION IN KENYA
10 AIMS OF KILOMBERO VALLEY IRRIGATION SCHEME
4 FEATURES OF MAP STATEMENT SCALE
10 ADVANTAGES OF OIL PRODUCTION IN THE MIDDLE EAST
7 DISADVANTAGES OF AIR TRANSPORT
10 PROBLEMS FACING COFFEE FARMING IN KENYA
IMPACTS OF POVERTY ON ENVIRONMENT
10 PROBLEMS FACING COTTON FARMING IN UGANDA
COMPARISON BETWEEN FISHING IN KENYA AND JAPAN

Comments
Post a Comment