14 PROBLEMS RESULTING FROM ESTABLISHMENT OF THE AKASOMBO DAM PROJECT IN GHANA

 The Akasombo dam project was opened in 1966 and was built across the volta river where the river passes through the narrow gorge.

The project was funded by Ghana, the United States of America, Britain, and the world bank.

PROBLEMS RESULTING FROM ESTABLISHMENT OF THE AKASOMBO DAM PROJECT IN GHANA


The following are problems which resulted from the establishment of the Akasombo dam project:

  • The loss of biodiversity, vegetation, and animal life was lost due to dam construction.

  • The decrease in the delta size due to reduced silt deposits and this negatively affected coastal activities such as tourism

  • Stagnation of water led to waterborne diseases such as bilharzia

  • Reduction of farming activities in the delta region due to the loss of fertile alluvial soil

  • The siltation of the lake, which necessitated constant dredging, is expensive

  • Displacement of many people from their land, since many villages were drowned by lake water

  • The high cost of resettling displaced people and the disruption of families

  • Pollution of the environment due to the development of many industries such as aluminium smelting at Tema. 

RELATED POSTS

9 CONDITIONS FAVOURING IRRIGATION FARMING IN EGYPT

5 CAUSES OF RURAL-RURAL MIGRATION IN KENYA

10 AIMS OF KILOMBERO VALLEY IRRIGATION SCHEME

4 FEATURES OF MAP STATEMENT SCALE

10 ADVANTAGES OF OIL PRODUCTION IN THE MIDDLE EAST

7 DISADVANTAGES OF AIR TRANSPORT

10 PROBLEMS FACING COFFEE FARMING IN KENYA

IMPACTS OF POVERTY ON ENVIRONMENT

10 PROBLEMS FACING COTTON FARMING IN UGANDA

COMPARISON BETWEEN FISHING IN KENYA AND JAPAN


Comments

Popular posts from this blog

10 TIPS TO PRESERVE THE ENVIRONMENT IN CANADA

5 TYPES OF HUMAN ACTIVITIES

10 EFFECTS OF THE KABAKA CRISIS OF 1953